ILLUSTRATED EXPLAINER · REVISION 1

Which efficiency number am I comparing?

Write the input and output boundary beside every percentage.

Published 2026-11-07 · Reviewed 2026-11-07

PV conversion, inverter conversion and AC round trip use different boundariesSunlight → DCPV conversionDC → ACInverter conversionAC → storage → ACAC round tripHypothetical matched window: 800 Wh out ÷ 1,000 Wh in = 80%Same storage endpoints and defined boundaries required.PV conversion, inverter conversion and AC round trip use different boundariesSunlight → DCPV conversionDC → ACInverter conversionAC → storage → ACAC round tripHypothetical matched window800 Wh out ÷ 1,000 Wh in = 80%Same storage endpoints required
The three boxes describe different ratios; they are not one measured flow or a common percentage. Round-trip numbers are invented, not a product result. Original SolarCompare.shop illustration.

The denominator matters.

PV conversion compares electrical output with incident solar input. An inverter’s DC-to-AC efficiency uses another boundary. A charge/discharge energy ratio uses yet another. Similar percentage signs do not make these measurements interchangeable.

Sources: US Department of Energy: PV performance and efficiency · SAM help: PV inverter models · SAM help: battery results

Use a matched energy accounting window.

For a hypothetical AC round-trip test, 1,000 Wh measured entering and 800 Wh leaving would give 80% only when the accounting window, starting/ending storage state and included loads are defined consistently. Rated battery capacity divided by recharge input does not substitute for measured discharge output. The figure is invented arithmetic, not a measured product result.

Sources: SAM help: battery results

Peak, weighted and operating efficiency differ.

SAM supports part-load inverter curves and separately displays weighted efficiency. One quoted value does not describe every load point. For a buyer, ask for the load, voltage, temperature, boundaries and method. Keep standby energy visible and avoid applying a modeled conversion loss to an output that already includes it.

Sources: SAM help: PV inverter models

What this changes when you shop.

  • Keep PV, inverter and round-trip boundaries separate.
  • A nominal-capacity ratio is not measured round-trip efficiency.
  • Use each loss once, at its documented boundary.

Sources, scope and corrections.

Conceptual buying guidance. Numerical examples are explicitly hypothetical; no exact product or installation is approved by this article.

Primary concept sources

  • US Department of Energy: PV performance and efficiency

    Conversion efficiency, temperature and reflection; not a forecast for a particular roof.

    Reviewed 2026-11-07. Publication date not established; review date is not a publication or experiment date.

    Source access and provenance

    Direct source captured.

    Captured 2026-11-08T01:51:11.720205+00:00 · SHA-256 89a3646b7e351a22092b9ecbbd24e681fa0d42481256254457ccbae6ea50688e

  • SAM help: PV inverter models

    DC-to-AC conversion, part-load curves and weighted efficiency; no universal inverter efficiency is assumed.

    Reviewed 2026-11-07. Publication date not established; review date is not a publication or experiment date.

    Source access and provenance

    Direct source captured.

    Captured 2026-11-08T01:51:11.503925+00:00 · SHA-256 5951a1ca3156eb556662c336798386d7557884a26acb62c0a1c8ca12561bb19f

  • SAM help: battery results

    Battery Storage Results: charge/discharge energy, temperature and separately modeled ancillary and converter losses.

    Reviewed 2026-11-07. Publication date not established; review date is not a publication or experiment date.

    Source access and provenance

    Direct source captured.

    Captured 2026-11-08T01:51:10.867215+00:00 · SHA-256 ef91e5d1d4d69173f3135b3767c78571fe44ebd43bd409dfbdfbe9bba39ff4cd

Illustration rights and meaning

Original site illustrations authorized for SolarCompare publication; no third-party artwork is reproduced. Source documents and publisher media retain their own rights. Conceptual diagrams and explicitly hypothetical arithmetic. No illustration is a measured curve or manufacturer drawing.

Article history

  1. · Initial publication. No subsequent correction is recorded in this revision.

New evidence is reviewed outside the build. A correction changes the article revision and records its date and reason; original source publication dates remain separate. Held observations stay held in the performance library until the source discrepancy is resolved.

Article metadata and source provenance · How we compare