Sources reviewed · 3 regulation sources
What to know in South Carolina.
South Carolina’s net-energy-metering law defines eligible customer-generation and requires applicable safety, performance, interconnection and reliability standards.
The State Energy Office directs interconnection and insurance questions to the utility and installer.
Do not assume one utility’s solar tariff applies statewide. The Building Codes Council directs project-specific code interpretations to the local building official; confirm the effective code cycle for your permit date.
Who provides electricity here?
Narrow possible delivery utilities by ZIP or confirm yours
Find the delivery utility on your electric bill first. A retail supplier or on-site solar seller may be a different company; your delivery utility handles the local grid connection.
ORS explains its electric utility role; municipal systems and cooperatives have different regulatory scope. Confirm the serving provider for the address.
South Carolina ORS: Electric UtilitiesBrowse 47 reported provider records in South Carolina
47 records
Electric delivery utilities 46
- Dominion Energy South Carolina, IncInvestor Owned · EIA 17539
Reported counties (23)
Abbeville, Aiken, Allendale, Bamberg, Barnwell, Beaufort, Berkeley, Calhoun, Charleston, Colleton, Dorchester, Edgefield, Fairfield, Greenwood, Hampton, Jasper, Lexington, McCormick, Newberry, Orangeburg, Richland, Saluda, Union
- Duke Energy Carolinas, LLCInvestor Owned · EIA 5416
Reported counties (19)
Abbeville, Anderson, Cherokee, Chester, Edgefield, Fairfield, Greenville, Greenwood, Kershaw, Lancaster, Laurens, McCormick, Newberry, Oconee, Pickens, Saluda, Spartanburg, Union, York
- South Carolina Public Service AuthorityState · EIA 17543
Reported counties (3)
Berkeley, Georgetown, Horry
- Duke Energy Progress - (NC)Investor Owned · EIA 3046
Reported counties (13)
Chesterfield, Clarendon, Darlington, Dillon, Florence, Georgetown, Horry, Kershaw, Lee, Marion, Marlboro, Sumter, Williamsburg
- Berkeley Electric Coop IncCooperative · EIA 1613
Reported counties (3)
Berkeley, Charleston, Dorchester
- Horry Electric Coop IncCooperative · EIA 8786
Reported counties (1)
Horry
- Palmetto Electric Coop IncCooperative · EIA 14398
Reported counties (4)
Allendale, Beaufort, Hampton, Jasper
- Blue Ridge Electric Coop Inc - (SC)Cooperative · EIA 1890
Reported counties (5)
Anderson, Greenville, Oconee, Pickens, Spartanburg
- York Electric Coop IncCooperative · EIA 21002
Reported counties (4)
Cherokee, Chester, Lancaster, York
- Laurens Electric Coop, IncCooperative · EIA 10768
Reported counties (7)
Abbeville, Anderson, Greenville, Laurens, Newberry, Spartanburg, Union
- Mid-Carolina Electric Coop IncCooperative · EIA 12462
Reported counties (5)
Aiken, Lexington, Newberry, Richland, Saluda
- Aiken Electric Coop IncCooperative · EIA 162
Reported counties (9)
Aiken, Barnwell, Calhoun, Edgefield, Greenwood, Lexington, McCormick, Orangeburg, Saluda
- City of Rock Hill - (SC)Municipal · EIA 16195
Reported counties (1)
York
- Santee Electric Coop, IncCooperative · EIA 16606
Reported counties (4)
Clarendon, Florence, Georgetown, Williamsburg
- Fairfield Electric Coop, IncCooperative · EIA 5929
Reported counties (5)
Chester, Fairfield, Kershaw, Richland, York
- MPD Electric CooperativeCooperative · EIA 66073
Reported counties (7)
Chesterfield, Darlington, Dillon, Florence, Lee, Marion, Marlboro
- Black River Electric Coop, Inc - (SC)Cooperative · EIA 1763
Reported counties (4)
Clarendon, Kershaw, Lee, Sumter
- Broad River Electric Coop, IncCooperative · EIA 2212
Reported counties (5)
Cherokee, Newberry, Spartanburg, Union, York
- Greer Commission of Public WksMunicipal · EIA 7654
Reported counties (2)
Greenville, Spartanburg
- Lynches River Elec Coop, IncCooperative · EIA 11355
Reported counties (3)
Chesterfield, Kershaw, Lancaster
- City of Orangeburg - (SC)Municipal · EIA 14164
Reported counties (1)
Orangeburg
- Tri-County Electric Coop, Inc (SC)Cooperative · EIA 14175
Reported counties (6)
Calhoun, Kershaw, Lexington, Orangeburg, Richland, Sumter
- Easley Combined Utility SystemMunicipal · EIA 6709
Reported counties (1)
Pickens
- Little River Electric Coop IncCooperative · EIA 11019Residential service not separately reported
Reported counties (4)
Abbeville, Anderson, Greenwood, McCormick
- Edisto Electric Coop, IncCooperative · EIA 5644
Reported counties (8)
Allendale, Bamberg, Barnwell, Berkeley, Colleton, Dorchester, Hampton, Orangeburg
- Newberry Electric Coop, IncCooperative · EIA 13524
Reported counties (4)
Fairfield, Laurens, Lexington, Newberry
- Coastal Electric Coop, Inc - (SC)Cooperative · EIA 3844Residential service not separately reported
Reported counties (3)
Bamberg, Colleton, Dorchester
- City of CamdenMunicipal · EIA 2890Residential service not separately reported
Reported counties (3)
Kershaw, Lee, Sumter
- Greenwood CPWMunicipal · EIA 7646
Reported counties (1)
Greenwood
- City of Seneca - (SC)Municipal · EIA 16921Residential service not separately reported
Reported counties (1)
Oconee
- City of Union - (SC)Municipal · EIA 19431Residential service not separately reported
Reported counties (1)
Union
- City of Gaffney - (SC)Municipal · EIA 6894
Reported counties (1)
Cherokee
- City of Laurens - (SC)Municipal · EIA 21526Residential service not separately reported
Reported counties (1)
Laurens
- City of Newberry - (SC)Municipal · EIA 13523Residential service not separately reported
Reported counties (1)
Newberry
- City of Georgetown - (SC)Municipal · EIA 7128Residential service not separately reported
Reported counties (1)
Georgetown
- Lockhart Power CoInvestor Owned · EIA 11118
Reported counties (5)
Cherokee, Chester, Spartanburg, Union, York
- City of Bennettsville - (SC)Municipal · EIA 1566Residential service not separately reported
Reported counties (1)
Marlboro
- Clinton Combined Utility SysMunicipal · EIA 3804Residential service not separately reported
Reported counties (1)
Laurens
- City of Abbeville - (SC)Municipal · EIA 34Residential service not separately reported
Reported counties (1)
Abbeville
- Town of Winnsboro - (SC)Municipal · EIA 20826Residential service not separately reported
Reported counties (1)
Fairfield
- Bamberg Board of Public WorksMunicipal · EIA 1170Residential service not separately reported
Reported counties (1)
Bamberg
- City of Westminster - (SC)Municipal · EIA 20490Residential service not separately reported
Reported counties (1)
Oconee
- Town of McCormick - (SC)Municipal · EIA 12006Residential service not separately reported
Reported counties (1)
McCormick
- Town of Prosperity - (SC)Municipal · EIA 15433Residential service not separately reported
Reported counties (1)
Newberry
- City of Due West - (SC)Municipal · EIA 5402Residential service not separately reported
Reported counties (1)
Abbeville
- Haywood Electric Member CorpCooperative · EIA 8333
Reported counties (1)
Oconee
On-site energy sellers 1
- Sunrun Inc.Behind the Meter · EIA 59647
Reported counties (0)
County coverage not reported in this source
No matching providers in this reporting snapshot. Check the official directory above.
Official logo sources · Initials indicate a logo not yet verified. Municipal-owner emblems identify the owning city or village.
Source: EIA-861 final 2025 detailed data · Reporting year 2025. Names and reported counties are historical survey data, not a live address lookup. A county can have several providers, and a listing does not mean every resident can choose it. Small/territory-only reports may not identify residential service separately.
Credits, rebates, and other opportunities.
Check the program’s scope before comparing savings: a tax exemption, equipment rebate, loan and electricity-export payment provide different benefits. Funding, utility territory, income, equipment and installation dates can limit eligibility. Amounts below are not added together or deducted from product prices.
Build a project incentive checklist for South Carolina
1 state & utility record
South Carolina Solar Energy Credit
South Carolina Department of Revenue · Solar
A qualifying taxpayer-owned solar system may qualify for the state’s nonrefundable income-tax credit.
- Benefit
- 25% of eligible purchase and installation costs; annual use is limited to the lesser of $3,500 per facility or 50% of state tax liability.
- Who may qualify
- Qualifying equipment installed in or on a South Carolina facility owned by the taxpayer; certification/licensing and state tax-liability rules apply.
- Before applying or buying
- Review DOR’s ruling and filing instructions before purchase and claim. Rebates may affect eligible costs; unused credit and carryforward are subject to the state rules.
No matching records in this reviewed selection. Check the official program sources for more options.
Selected official opportunities, not a complete inventory. Eligibility, participating utilities, available funds and application timing must be confirmed for the service address. This is a curated starting list, not every local incentive or a guarantee of available funding.
Federal programs in every state
The federal rules below apply nationally. State-administered federal rebates still require the local program to be operating and your project to meet its conditions.
Residential Clean Energy Credit (25D)
Closed / endedNot available for new property placed in service after December 31, 2025. Do not assume a federal 30% credit for a new 2026 solar, wind, geothermal or battery installation.
IRS: Residential Clean Energy CreditEnergy Efficient Home Improvement Credit (25C)
Closed / endedThe federal home-efficiency credit, including qualifying heat-pump improvements, ended for property placed in service after December 31, 2025.
IRS: Energy Efficient Home Improvement CreditHOMES / High-Efficiency Electric Home Rebates
Eligibility / funding conditionsFederally funded home-energy rebates operate through participating local administrators. Check the state program’s launch, current funding, eligible measures and application requirements. This is not a blanket rooftop-solar rebate.
DOE: Home Energy Rebates ProgramWeatherization Assistance Program
Eligibility / funding conditionsIncome-eligible households may receive approved home-weatherization services through local agencies. This is assistance delivered through a program, rather than an automatic reimbursement for equipment you buy.
DOE: How to Apply for Weatherization Assistance
Permits and electrical codes.
Confirm the adopted electrical, building and fire code editions and amendments with the authority issuing the permit. A utility approval does not replace construction permits or inspections.
Use the adoption authority linked below to check the effective date and amendments. The newest published NEC edition is not automatically the edition adopted for your project.
Before ordering equipment.
Two conversations. Keep their answers separate.
Track permits and interconnection in a project
- Confirm the permit authority
Ask the city, county, or state electrical office which building, electrical and fire-code editions and amendments apply to this address. Request the solar/ESS permit checklist and inspection sequence.
- Confirm the utility process
Give the serving utility your proposed capacity, inverter model and operating mode. Ask which interconnection application, tariff, export limits, meter changes and written operating authorization apply.
- Document the exact equipment
Collect model-specific certificates, installation manuals, a one-line diagram, site/roof plans, and the battery/inverter pairing if storage is proposed. Check them with the permit authority and utility before ordering.
For the general permitting and inspection process: DOE: Permitting and Inspection for Rooftop Solar .
UL, NEMA, and system acceptance.
Different evidence, different scope.
Check the exact model and approved system configuration. A UL 1973 battery listing or UL 9540A fire-test report does not, by itself, establish UL 9540 certification of a complete storage system.
Open the UL & NEMA referenceScope and system-level certification: UL Solutions: Energy Storage System Testing and Certification .
Official sources.
Open the source for current forms, eligibility, tariffs, and adopted rules. Utility-specific examples apply to that provider.
- interconnection billingSouth Carolina Code: Title 58, Chapter 40
- interconnectionSouth Carolina Energy Office: Who to contact
- codesSouth Carolina Building Codes Council
